Our BIM modeling started before the construction drawings were completed. Our design-assist efforts resulted in the elimination of unnecessary electrical equipment, fixture list revisions and workspace reorganization which resulted in significant cost savings to the owner. MMC was engaged during the conceptual design phase of this6-story hotel/spa/casino facility to perform document reviews and provide value engineering services in advance of the installation of the electrical systems.